Bacharach NEW! Fyrite InTech Owner's Manual Page 44

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 43
Fyrite
InTech
Manual Operation
0024-9486 Rev 2 38
Section 4. Operation
4.1. Prerequisites
Before beginning your combustion test, verify the following:
menu items are properly configured
the water trap is empty, filter is clean, and arrow is pointing UP
the probe and thermocouple are attached to the instrument
the power is ON and sufficient (one of the following):
o four new batteries (AA alkaline)
o four new batteries (AA lithium)
o four fully-charged AA rechargeable batteries
the warm-up process has completed in fresh air without interruption
or errors.
4.2. Sampling Point Examples
WARNING: The illustrations of combustion devices and sampling
points in this section are examples only. Be sure to consult with
the manufacturer
’s documentation for the combustion devices
you are servicing.
The following combustion devices and example sampling points are shown and
explained below:
Example forced air furnace
Example hot water tank
Example 90% efficiency condensing furnace
Example 80% efficiency fan assist or power vented furnace
Example atmospheric/gravity vented boiler
Page view 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 71 72

Comments to this Manuals

No comments