Bacharach Flue-Gas Sample Conditioning System User Manual

Browse online or download User Manual for Pellet stove Bacharach Flue-Gas Sample Conditioning System. Introduction Instruction 0024-9415 Flue

  • Download
  • Add to my manuals
  • Print
  • Page
    / 10
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Introduction
The Bacharach Flue-Gas Sample Conditioning System consists of the
following components:
Probe with Peltier Cooler
Condensate Pump with Water Trap
• Power Supply
The function of this system is to remove water vapor from the ue-gas
sample, thus preventing the formation of water droplets inside the
probe hose. If water droplets were to form inside the hose, a por tion of
the gas sample could be ab sorbed by the water, thus resulting in lower-
than-actual read ings of NO
2
and SO
2
.
Water vapor is removed from the ue-gas sample by passing the sam ple
through a Peltier Cooler where the sample is chilled, which in turn,
causes the water vapor contained in the gas sam ple to be removed from
the sample.
The water that was extracted from the gas sample is then pumped out
of the Peltier Cooler and into a water trap.
The now dry, conditioned ue-gas sample is then sent to its as so ci at ed
com bus tion test equipment for analysis.
Product Leadership • Training • Service • Reliability
Figure 1. Flue-Gas Sample Conditioning System
Probe w/ Peltier Cooler
Power Supply
Instruction 0024-9415
Flue-Gas Sample
Conditioning System
P/N 0024-7224
Rev. 8 – May 2010
Pump
w/ Water Trap
Page view 0
1 2 3 4 5 6 7 8 9 10

Summary of Contents

Page 1 - Conditioning System

IntroductionThe Bacharach Flue-Gas Sample Conditioning System consists of the following components:• Probe with Peltier Cooler• Condensate Pump with

Page 2 - Equipment Setup

Instruction 0024-9415 Bacharach, Inc. 11Flue Gas Sample Conditioning SystemHeadquarters:621 Hunt Valley Circle, New Kensington, PA 15068Ph: 724-334-

Page 3 - Figure 2. Equipment Setup

Instruction 0024-9415 Bacharach, Inc. 3Flue Gas Sample Conditioning SystemTechnical DataProbe: Standard Length ...

Page 4 - Operation

Flue Gas Sample Conditioning System4 Bacharach, Inc. Instruction 0024-9415Figure 2. Equipment SetupPELTIERCOOLERPROBE ASSEMBLYPUMPPOWER SUPPLY100 –

Page 5 - Maintenance

Instruction 0024-9415 Bacharach, Inc. 5Flue Gas Sample Conditioning SystemOperationWhen ready to conduct a combustion effi ciency test, plug in the p

Page 6 - Replacement Parts

Flue Gas Sample Conditioning System6 Bacharach, Inc. Instruction 0024-9415MaintenanceProbeThe probe’s sponge-type fi lter (Figure 3, Item 9) needs to

Page 7 - Figure 3. Replacement Parts

Instruction 0024-9415 Bacharach, Inc. 7Flue Gas Sample Conditioning SystemReplacement PartsItem Description Part No.(Fig 3) Probe: 1 Complete

Page 8

Flue Gas Sample Conditioning System8 Bacharach, Inc. Instruction 0024-9415Figure 3. Replacement Parts11202012Part of Item 10121967852Part of Item 10

Page 9

Instruction 0024-9415 Bacharach, Inc. 9Flue Gas Sample Conditioning SystemBacharach Sales/Service CentersService can be obtained by contacting a Bac

Page 10 - Headquarters:

Flue Gas Sample Conditioning System10 Bacharach, Inc. Instruction 0024-9415

Comments to this Manuals

No comments